How long does a typical website redesign project take?
Planning and Discovery Phase
- Duration: 1 to 3 weeks depending on business size and content volume.
- Activities include requirement gathering, competitor analysis, and goal setting.
- Stakeholder interviews and existing website audits are conducted.
- Deliverables: project scope document, feature list, and initial timelines.
- Resource allocation and budgeting are finalized during this phase.
Design and Prototyping
- Duration: 2 to 5 weeks based on the number of templates and feedback cycles.
- Wireframes, mockups, and interactive prototypes are created.
- Iterations are made based on stakeholder and user feedback.
- Visual branding elements are aligned with existing or new guidelines.
- Approval of final design sets the stage for development work.
Development and Integration
- Duration: 4 to 8 weeks, depending on complexity and CMS used.
- Front-end and back-end coding, database connections, and APIs are developed.
- CMS integration and dynamic content handling are set up.
- E-commerce features, user portals, and third-party tool connections are implemented.
- Responsive design and speed optimization are completed in this phase.
Content Migration and Testing
- Duration: 1 to 3 weeks depending on content volume.
- Existing content is audited, formatted, and moved into the new design.
- SEO and accessibility checks are performed.
- QA testing ensures functionality, forms, and navigation work properly.
- Final round of UAT is conducted before launch approval.
Launch and Post-Launch Support
- Duration: 1 to 2 weeks for monitoring and minor fixes.
- Site is moved from staging to live with backup support in place.
- Monitoring tools and analytics are reconfigured for the new site.
- Performance is tracked closely, and urgent bugs are resolved.
- Post-launch reviews determine if KPIs and goals are met.