Blog Details

Hello InTech

What is the cost structure typically involved in application re-design?

Planning and Analysis Costs

  • Expenses incurred during requirement gathering, stakeholder meetings, and documentation.
  • Business analysis and system assessment activities require dedicated resources.
  • Feasibility studies and solution architecture planning add to early-stage costs.
  • Tool subscriptions used for modeling, diagramming, or collaboration may be required.
  • Time and effort spent defining scope, timelines, and risks are factored into planning budgets.

Design and Prototyping Costs

  • User interface design and experience mapping involve design specialists and tools.
  • Wireframing, prototyping, and validation sessions require time and resources.
  • Revisions based on user or stakeholder feedback may increase design cycles.
  • Responsive design for multiple devices adds to design complexity and cost.
  • Accessibility and compliance testing during design phases incur additional effort.

Development and Integration Costs

  • Core costs include developer effort across frontend, backend, and middleware layers.
  • Integration with internal and external systems requires API development and testing.
  • Legacy system interaction, refactoring, or migration efforts may require specialized skills.
  • Adoption of new technologies may lead to higher initial implementation effort.
  • Parallel development and support for legacy systems may increase workload and overhead.

Testing and Quality Assurance Costs

  • Test planning, execution, and automation involve dedicated quality assurance teams.
  • Performance, security, and compliance testing require specialized tools or services.
  • User acceptance testing with real-world scenarios may involve operational stakeholders.
  • Test environments and data preparation add to infrastructure usage.
  • Iterative testing across sprints increases cumulative QA effort.

Deployment and Post-Launch Costs

  • Production deployment, rollback plans, and support configurations incur final-phase costs.
  • Training, user onboarding, and documentation are essential for adoption readiness.
  • Monitoring, logging, and alerting tools are included in go-live preparation.
  • Bug fixes and enhancements after release require maintenance budget allocation.
  • Continuous improvement planning includes minor iterations and feature refinements.

Leave A Comment

Cart (0 items)

Our professionals engage in a wide range of activities, including the design, development, implementation, management, and support of information technology solutions.

No. 149/1, Ground Floor, Elango Street, Thiruvalleeswarar Nagar, Anna Nagar West, Chennai 600040.
Tamilnadu, India
Call Us: 94 45 48 48 48
(Mon - Saturday)
Monday - Saturday
(09am - 07pm)